Bannière

Newsletter


Publicité

Bannière
PUBLICITE

Dossier de la Rédaction

PUBLICITE
Bannière

Olympic City Construction: MINSEP-CNOSC Sign Accord

The convention was signed by Minister Adoum Garoua and Hamad Kalkaba Malboum on April 20, 2015.

The Minister of Sports and Physical Education, Adoum Garoua and the president of the National Olympic and sports committee, Colonel Hamad Kalkaba Malboum, yesterday signed a convention towards the construction of an Olympic city in Obala near Yaounde.  Speaking during the signing ceremony at his cabinet, Minister Adoum Garoua said the construction of the Olympic village is an emanation of the wish of the president of the republic to furnish Cameroonian athletes a befitting sports infrastructure.

He said the Olympic city is futuristic and places sports at the forefront of Cameroon’s emergence effort and also falls within the frame work of the programme for the development of sports infrastructure. He said government will support the project and urged it to go to the logical ending saying the accord was proof of collaboration between his ministry and sports organizations.

The president of the Olympic committee said the idea to construct the Olympic city came from the escape of seven Cameroonian athletes during the London Olympic in 2012 which made them to realize the need for a high level training infrastructure for athletes so as to curd the talent drain. Colonel Hamad Kalkaba Malboum said contrary to stadiums which are reserved for football and athletics, the Olympic city have training facilities for all sports disciplines as well as an office for sports federations.

He said the centre which will be similar to the Aspire Centre in the United Arab Emirates will comprise a football stadium, an athletics track, a gymnasium and a big hall for the practice of sports disciplines like basketball, volleyball, handball, taekwondo and others. There will also be a medical centre and a training centre for the reconversion of athletes. He said the construction of the Olympic City could last from three to four years and the cost will only be determined after feasibility studies must have been conducted.


Commentaires (0)
Seul les utilisateurs enregistrés peuvent écrire un commentaire!

!joomlacomment 4.0 Copyright (C) 2009 Compojoom.com . All rights reserved."



haut de page  
PUBLICITE
Bannière